Mutale Raw & Potable Bulk Water System Upgrade (Contracts C1–C5)

Scope:
 

  • Upgrading and rehabilitating the existing raw water source infrastructure, including the weir and raw water pumping systems.

  • Enhancing both low-lift and high-lift pump stations to capacities of up to 20.7 Ml/day, including the installation of sump and new pumping mains.

  • Upgrading the high-lift pumping main with additional 400mm diameter pipelines to improve water transfer capacity.

  • Refurbishing existing treatment infrastructure, including SSF (4.4Ml) and RGF (8.6Ml) process trains.

  • Phased upgrades of the Mutale Water Treatment Works to increase capacity from 16Ml to 24Ml.

  • Construction of a new 42Ml raw water dam and refurbishment of the existing raw water dam to enhance raw water storage and reliability.

 

Client: Vhembe District Municipality

 

Date: March 2023