
Construction of Steel Bulk Pipeline & Water Reticulation – Mamelodi Ext. 11 (Phase 2)
Scope:
-
Upgrade and relocation of the existing operational Mamelodi/Bronberg bulk water line, which connects to the R5 and R6 reservoir zones via a PRV system.
-
Construction of a new 1042mm diameter, 70m long X42 steel pipeline for bulk water transmission.
-
Installation of a 711mm diameter, 980m long X42 steel pipeline to support bulk water flow.
-
Development of a comprehensive water reticulation network, including 110mm (7,430m), 200mm (2,066m), and 400mm (1,500m) diameter pipelines.
-
Construction of associated concrete chambers to support the new bulk water infrastructure.
-
Provision of 1,871 new house connections to ensure household-level water supply access.
Client: City of Tshwane Metro Municipality
Date: September 2024

Contact us
