top of page
500mm-drink-water-pipes-joined-with-new-blue-gate-valves-new-black-waga-multi-joint-member

Construction of Steel Bulk Pipeline & Water Reticulation – Mamelodi Ext. 11 (Phase 2)

Scope:
 

  • Upgrade and relocation of the existing operational Mamelodi/Bronberg bulk water line, which connects to the R5 and R6 reservoir zones via a PRV system.

  • Construction of a new 1042mm diameter, 70m long X42 steel pipeline for bulk water transmission.

  • Installation of a 711mm diameter, 980m long X42 steel pipeline to support bulk water flow.

  • Development of a comprehensive water reticulation network, including 110mm (7,430m), 200mm (2,066m), and 400mm (1,500m) diameter pipelines.

  • Construction of associated concrete chambers to support the new bulk water infrastructure.

  • Provision of 1,871 new house connections to ensure household-level water supply access.
     

Client: City of Tshwane Metro Municipality
 

Date: September 2024

Contact us

bottom of page